The AIA Documents Synopses is a quick reference for determining the appropriate
uses for each of the contracts administrative forms published by the American Institute of
Architects. That purpose naturally presumes independent judgment on the reader's part, as
well as advice of counsel. This introduction is intended to provide an overview for
readers who are not yet familiar with the AIA documents. There are over
75 AIA contracts and administrative forms in print today. The ancestor of all of these was
the Uniform Contract, an owner-contractor agreement, first published in 1888. This was
followed, in 1911, by AIA's first standardized general conditions for construction. The
1997 edition of AIA Document A201 is the fifteenth edition of those general conditions.
Many practices common in the construction industry today became established
through their inclusion in AIA's general conditions and its other standardized documents.
Arbitration, the one-year correction period, and the architect's role in deciding disputes
are just three of these. And while the AIA documents have had a profound influence on the
industry, the influence also runs the other way. The AIA regularly revises its documents
to take into account recent developments in the construction industry and the law. New
standardized documents for design/build and for different types of construction management
have been published in recent years, and documents for international practice are now
under consideration.
Because the AIA documents are frequently updated, users should consult an AIA
component chapter or obtain a current copy of the AIA Contract Documents Price List to
determine the current editions. The documents' relationship to the industry influencing
it, and in turn being influenced by it-is paralleled by their relationship to the law. The
AIA documents are intended for nationwide use, and are not drafted to conform to the law
of any one state. With that caveat, however, AIA contract documents provide a solid basis
of contract provisions that are enforceable under the law existing at the time of
publication. Case law on contracts for design and construction has for the past century
been based largely on the language of AIA standardized documents and contracts derived
from them. These court cases are listed in The American Institute of Architects Legal
Citator. Recent cases are summarized, and all cases are keyed to the specific provisions
in the AIA documents to which they relate.
Sample copies of many of the current AIA documents are contained in The
Architect's Handbook of Professional Practice. Other material of interest in the Handbook
includes commentaries on AIA Documents A201 and B141. A section entitled "The AIA
Documents: An Overview" provides a useful review of the document
"families." These groups of documents are coordinated to tie together the
various legal and working relationships on the same project types. Documents within the
same family are linked by common terminology and procedures, and may also adopt one
another by reference. The relevant terms of A201, for example, are adopted by reference in
A101, A111, A401, B141, B151, and C141.
The listings in the Synopses are organized according to letter series, a system
of classification that cuts across the various families and refers to the specific purpose
of each document. The letter designations indicate the following:
A-Series-owner-contractor documents
B-Series-owner-architect documents
C-Series-architect-consultant documents
D-Series-architect-industry documents
G-Series-architect's office and project forms
The preceding paragraphs contain several references to "standardized documents,"
a term that covers most AIA documents. AIA standardized documents are intended to be used
in their original, printed form. Much of the efficiency these documents bring to a
transaction depends on their being used in this way: people with experience in the
construction industry are familiar with them, and can quickly evaluate the proposed
transaction based on the modifications made to the standardized document - if those
modifications stand out. If modifications are blended into text of these documents that has
been retyped or scanned, this advantage is lost.
The modifications themselves may be derived from another type of document
published by the AIA. These are model documents, whose language is intended to be
reproduced and adapted by users. One such repository of model text is A511. It is intended
for use in developing supplementary conditions, an important component of the contract for
construction. B511 serves a similar purpose with respect to owner-architect agreements.
AIA documents are currently available in both printed and electronic format. The
software package AIA Contract Documents; Electronic Format for Windows enables users to
access and print out the AIA documents. Modifications are clearly shown; deleted language
appears with strike-through, and added language is underscored. Systems requirements for
Version 2.5 of this software are:
486 or faster PC
8 MB RAM (16 MB recommended for Windows 95)
10 MB of free hard drive
Mouse
VGA color monitor
Laser printer supported by Windows 95, or Windows NT 4.0
One of the following Windows operating systems:
Windows 95
Windows NT version 4.0
Certain G-Series documents require:
Lotus 1-2-3 version 2.3 or higher for DOS
Excel 4.0 or higher for Windows
AIA documents in printed form may be obtained from your local AIA distributor (AIA Fort
Worth) by calling (817) 927-2411. The software package AIA contract Documents: Electronic
Format for Windows may be obtained by calling (800) 246-5030 or receive a copy of the
license agreement for EF by calling (817) 927-2411.
References
Further information on the AIA documents may be obtained from publications listed below.
Information on the documents is also available on AIA's website at
www.aia.org.
AIA Contract Documents Price List: This publication is available free from AIA
distributors or by calling AIA Fort Worth at (817) 927-2411. It is also listed in this web
site and shows the current edition of each AIA document.
You and Your Architect: This booklet, available free to AIA members, reviews
issues to be considered by an owner preparing to retain an architect. A free copy is
available from the AIA Fort Worth office and may be picked up during regular office hours.
The Architect's Handbook of Professional Practice. The Handbook has been the
architecture profession's premier manual of practice since its first publication in 1917.
It contains sample copies of most of the AIA documents. Other sections of particular
interest include:
"Documents Finder"
"The AIA Documents"
"The AIA Documents: An Overview"
"Glossary of Construction Industry Terms"
"A201 Commentary"
"B141 Commentary"
Please call (817) 927-2411 to order The Handbook. (price+tax+shipping)
The Documents Supplement Service . This is a subscription service through which
users of the Handbook can receive sample copies of new AIA documents as they are
published. Subscribers also receive the Supplement, a newsletter of articles and comment
on the AIA documents. Subscriptions may be obtained by calling (800) 365-2724.
The American Institute of Architects Legal Citator.
Steven G. M. Stein, Ed. New York: Matthew Bender, 1997.
Please call (800) 833-9844
Promises, Promises: Forging Healthy Project Relationships
This is a series of continuing education manuals, each of which may be used either for
seminar presentation or for self-study. AIA members receive five learning units for each
manual used in a workshop format under the sponsorship of the AIA Documents Program.
Self-study/facilitator manuals and participant's manuals may be obtained by calling (800)
365-2724.
Sweet, Justin. Sweet on Construction Industry Contracts: Major AIA Documents. Construction
Law Library, vol. 1. New York: Aspen Publishers, 1996. Please call (800) 225-5945.
Sabo, Werner. Legal Guide to AIA Documents. Fourth Ed. New York: Aspen
Publishers, 1992. Please call (800) 638-8437.
AIA Documents Synopses
A-Series
The documents in the A-series relate to various forms of agreement between an owner and
contractor.
A 101 Owner-Contractor Agreement Form-Stipulated Sum
This is a standard form of agreement between owner and contractor for use where the basis
of payment is a stipulated sum (fixed price). The A101 document adopts by reference and is
designed for use with AIA Document A201, General Conditions of the Contract for
Construction, thus providing an integrated pair of legal documents. When used together,
they are appropriate for most projects. For projects of limited scope; however, use of AIA
Document A107 might be considered.
A101/Cma Owner-Contractor Agreement Form-Stipulated Sum-Construction
Manager-Advisor Edition
A101/CMa is a standard form of agreement between owner and contractor for use on projects
where the basis of payment is a stipulated sum (fixed price), and where, in addition to
the contractor and the architect, a construction manager assists the owner in an advisory
capacity during design and construction. The document has been prepared for use with AIA
document A201/Cma, General Conditions of the Contract for Construction-Construction
Manager-Adviser Edition. This integrated set of documents is appropriate for use on
projects where the Construction Manager serves only in the capacity of an adviser to the
owner, rather than as constructor (the latter relationship being represented in AIA
Documents A121/CMc and A131/CMc). A101/Cma is suitable for projects where the cost of
construction has been predetermined, either by bidding or by negotiation.
A105/A205 Standard Form of Agreement Between Owner and Contractor for
A Small Project General Conditions of the Contract for Construction of a Small Project
AIA Documents A105 and A205 are intended to be used in conjunction with one another. The
two documents are only sold as a set, and they share a common Instruction Sheet. They have
been developed for use where payment to the Contractor is based on a stipulated sum (fixed
price) and where the project is modest in size and brief in duration. A105 and A205 are
two of the three documents that comprise the Small Projects family of documents. They have
been developed for use with AIA Document B155, Standard Form of Agreement Between Owner
and Architect for a Small Project. These documents are specifically coordinated for use as
a set. Although, A105, A205, and B155 may share some similarities with other AIA
documents, the Small Project documents should NOT be used with other AIA documents without
careful side-by-side comparison of contents. A205 is considered to be the keystone
document of the Small Projects family, since it is specifically adopted by separate
reference into both A105 and B155. A205 is a vital document, in that it is used to
allocate proper legal responsibilities among the parties, while providing both a common
ground and a means of coordination within the Small Projects family. In order to maintain
the condensed nature of this document, arbitration and other ADR provisions have been
omitted. ADR provisions may be included in A105 under Article 6.
A107 Abbreviated Standard Form of Agreement Between Owner and
Contractor for Construction Projects of Limited Scope-Stipulated Sum
As an abbreviated form of agreement between owner and contractor, this document is
intended for use where the basis of payment is a stipulated sum (fixed price). It is
appropriate for construction projects of limited scope not requiring the complexity and
length of the combination of AIA Documents A101 and A201. The document contains
abbreviated general conditions. It may be used when the owner and contractor have
established a prior working relationship (e.g., a previous project of like or similar
nature), or where the project is relatively simple in detail or short in duration.
A111 Standard Form of Agreement Between Owner and Contractor-
Cost of the Work Plus a Fee With a Negotiated Guaranteed Maximum Price
The standard form of agreement between owner and contractor is appropriate for use on most
projects requiring a negotiated guaranteed maximum price, when the basis of payment to the
contractor is the cost of the work plus a fee. A11 adopts by reference and is intended for
use with AIA Document A201, General Conditions of the Contract for Construction, thus
providing an integrated pair of legal documents.
A121/CMc Owner-Construction Manager Agreement Where the Construction
Manager is Also the Constructor
(AGC Document 565)
This document represents the collaborative efforts of the American Institute of Architects
and the Associated General Contractors of America. AIA designated this document as
A121/CMc and AGC designates it as AGC 565. A121/CMc is intended for use on projects where
a construction manager, in addition to serving as adviser to the owner, assumes financial
responsibility for construction of the project. The construction manager provides the
owner with a guaranteed maximum price proposal, which the owner may accept, reject or
negotiate. Upon the owner's acceptance of the proposal by execution of an amendment, the
construction manager becomes contractually bound to provide labor and materials for the
project. The document divides the construction manager's services into two phases: the
pre-construction phase and the construction phase, portions of which may proceed
concurrently in order to fast track the process. A121/CMc is coordinated for use with AIA
Document A201, General Conditions of the Contract for Construction, and B141, Standard
Form of Agreement Between Owner and Architect. Check Article 5 of B511 for guidance in
this regard. Caution: to avoid confusion and ambiguity, do not use this construction
management document with any other AIA or AGC construction management document.
A131/CMc Owner-Construction Manager Agreement Where the Construction
Manager Is Also the Constructor-Cost Plus a Fee, No Guarantee of Cost
(AGC Document 566)
Similar to A121/CMc, the CM-constructor agreement is also intended for use when the owner
seeks a construction manager who will take on responsibility for providing the means and
methods of construction. However, the method of determining cost of the work diverges
sharply in the two documents, with A121/CMc allowing for a Guaranteed Maximum Price (GMP)
while A131/CMc uses a Control Estimate. A 131/CMc employs the cost-plus-a-fee method,
wherein the owner can monitor cost through periodic review of the Control Estimate, which
is revised as the project proceeds. It is important to note that, while the CM-constructor
may be assuming varied responsibilities, there are still just three primary players on the
project: the owner, architect and CM-constructor. The A201 General Conditions continues to
apply, although it is modified (in part) by the A131/CMc agreement. Caution: to avoid
confusion and ambiguity, do not use this construction management document with any other
AIA or AGC construction management document.
A171 Owner-Contractor Agreement Form for Furniture, Furnishings,
and Equipment-Stipulated Sum
This is a standard form of agreement between owner and contractor for furniture,
furnishings and equipment (FF&E) where the basis of payment is a stipulated sum (fixed
price). A171 adopts by reference and is intended for use with AIA Document A271, General
Conditions of the Contract for Furniture, Furnishings and Equipment. It may be used in any
arrangement between the owner and the contractor where the cost of FF&E had been
determined in advance, either through bidding or negotiation.
A177 Abbreviated Owner-Contractor Agreement Form for Furniture,
Furnishings, and Equipment-Stipulated Sum
A177 is an abbreviated document that derives much of its content from a combination of the
more complex and lengthy A171 and A271 documents. Its abbreviated terms and conditions may
be used on projects where the contractor for furniture, furnishings, and equipment
(FF&E) has a prior working relationship with the owner, or where the project is
relatively simple in detail or short in duration. Caution: this document is not intended
for use on major construction work that may involve life safety systems or structural
components.
A191 Owner-Design/Builder Agreements
This document contains two agreements to be used in sequence by an owner contracting with
one entity serving as a single point of responsibility for both design and construction
services. Design/build entities may be architects, contractors or others, so long as they
comply with governing law; especially those pertaining to licensing and public procurement
regulations. The first agreement covers preliminary design and budgeting services, while
the second deals with final design and construction. Although it is anticipated that an
owner and a design/builder entering into the first agreement will later enter into the
second, the parties are not obligated to do so and many conclude their relationship after
the terms of the first agreement have been fulfilled.
A201 General Conditions of the Contract for Construction
The General Conditions are an integral part of the contract for construction, in that they
set forth the rights, responsibilities and relationships of the owner, contractor and
architect. While not a party to the contract for construction between owner and
contractor, the architect does participate in the preparation of the contract documents
and has certain duties and responsibilities described in detail in the general conditions.
This document is typically adopted by reference into certain other AIA Documents, such as
owner--architect agreements, owner-contractor agreements and contractor-subcontractor
agreements. Thus, it is often called the "keystone" document. Since conditions
vary by locality and by project, supplementary conditions are usually added to amend or
supplement portions of the General Conditions as required by the individual project. The
model language provided in A511 should be reviewed as a guide in creating supplementary
conditions for A201.
A201/CMa General Conditions of the Contract for Construction-Construction
Construction Manager-Adviser Edition
A201/CMa is an adaptation of AIA Document A201 and has been developed for construction
management projects where a forth player-A construction manager-has been added to the team
of owner, architect and contractor. Under A201/CMa, the construction manager has the role
of an independent adviser to the owner. Thus, the document carries the CMa suffix. A major
difference between A201 and A201/CMa occurs in Article 4, Administration of the Contract,
which deals with the duties and responsibilities of both the architect and the
construction manager-adviser. Another major difference implicit in A201/CMa is the use of
multiple construction contracts directly with trade contractors. Caution: it is vital that
A201/CMa not be used in combination with documents where it is assumed that the
construction manager takes on the role of constructor, gives the owner a guaranteed
maximum price or contracts directly with those who supply labor and materials for the
project.
A201/SC Federal Supplementary Conditions of the Contract for
Construction
A201/SC is intended for use on certain federally assisted construction projects. For such
projects, A201/SC adapts A201 by providing (1) necessary modifications of the General
Conditions, (2) additional conditions and (3) insurance requirements for federally
assisted construction projects.
A271 General Conditions of the Contract for Furniture, Furnishings and
Equipment
When the scope of a contract is limited to furniture, furnishings and equipment
(FF&E), A271 is intended for use in a manner similar to the way in which A201 is used
for construction projects. The AIA and the American Society of Interior Designers (ASID)
jointly developed the document. Because the Uniform Commercial Code (UCC) had been adopted
in virtually every jurisdiction, A271 has been drafted to recognize the commercial
standards set forth in Article 2 of the UCC, and uses certain standard UCC terminology.
Only incidental interior construction services are intended to be provided under this
document.
A305 Contractor's Qualification Statement
An owner preparing to request bids or to award a contract for a construction project often
requires a means of verifying the background, history, references and financial stability
of any contractor being considered. The time frame for construction and the contractor's
performance history, previous experience and financial stability are important factors for
an owner to investigate. This form provides a sworn, notarized statement with appropriate
attachments to elaborate on important aspects of the contractor's qualifications.
A310 Bid Bond
This simple one-page form was drafted with input from the major surety companies to ensure
its legality and acceptability. A bid bond establishes the maximum penal amount that may
be due the owner if the selected bidder fails to execute the contract and provide any
required performance and payment bonds.
A312 Performance Bond and Payment Bond
This form incorporates two bonds covering, first, the contractor's performance and,
second, the contractor's obligation to pay subcontractors and others for material and
labor. In addition, the A312 document obligates the surety to act responsively to the
owner's requests for discussions aimed at anticipating or preventing a contractor's
default.
A401 Standard Form of Agreement Between Contractor and
Subcontractor
This document is intended for use in establishing the contractual relationship between the
contractor and subcontractor. It spells out the responsibilities of both parties and lists
their respective obligations, which are written to parallel AIA Document A201, General
Conditions of the Contract for Construction. Blank spaces are provided where the parties
can supplement the details of their agreement. A401 may be modified for use as a
subcontractor-sub-contractor agreement.
A491 Design/Build-Contractor Agreements
A491 contains two agreements to be used in sequence by a design/builder and a construction
contractor. The first agreement covers management consulting services to be provided
during the preliminary design and budgeting phase of the project, while the second covers
construction. AIA Document A201, General Conditions of the Construct for Construction, is
adopted into the second agreement by reference. It is presumed that the design/builder has
contracted with an owner to provide design and construction services under the agreements
contained in AIA Document A191. Although it is anticipated that a design/builder and a
contractor entering into the first agreement will later enter into the second, the parties
are not obligated to do so, and may conclude their relationship after the terms of the
first agreement have been fulfilled. It is also possible that the parties may forgo
entering into the first agreement and proceed directly to the second.
A501 Recommended Guide for Competitive Bidding Procedures and
Contract Awards for Building Construction
This guide outlines appropriate procedures in the bidding and awarding of contracts when
competitive lump sum bids are requested in connection with building and related
construction. The Guide is a joint publication of the AIA and the Associated General
Contractors of America (AGC).
A511 Guide for Supplementary Conditions
A511 is a guide for modifying and supplementing A201, the General Conditions of the
Contract for Construction. It provides model language with explanatory notes to assist
users in adapting A201 to local circumstances. Although A201 is considered the keystone in
the legal framework of the construction contract, it is a standard document and cannot
cover all the particulars of a specific project. Thus, A511 is intended as an aid to users
of A201 in developing supplementary conditions.
This document contains both model text and explanatory notes to the user. Excerpting of
the model text is permitted by the AIA under a limited license for reproduction granted
for drafting the supplementary conditions of a particular project.
A511/CMa Guide for Supplementary Conditions-Construction Manager-
Adviser Edition
Similar to A511, the A511/CMa document is a guide to model provisions for supplementing
the general conditions of the contract for construction, construction manager-adviser
edition (AIA Document A201/CMa). A511/CMa should only be employed-as should A201/CMa-on
projects where the construction manager is serving in the capacity of adviser to the owner
(as indicated by the CMa document designation), and not in situations where the
Construction Manager is also the constructor (CMc document-based relationships). Caution:
CMc documents are based on utilization of the A201 document, which in turn should be
modified using A511 as a guide.
Like A511, this document contains suggested language for supplementary conditions, along
with notes on appropriate usage. However, many important distinctions are made to ensure
consistency with other construction manager-adviser documents.
A521 Uniform Location of Subject Matter
A521 is a joint publication of the AIA and the Engineers Joint Contract Documents
Committee (EJCDC), which is composed of the National Society of Engineers, American
Consulting Engineers Council and American Society of Civil Engineers. By consensus of
these organizations, the AIA and EJCDC documents follow A521's tabular guide with regard
to the placement of subject matter among the various contracts and bidding documents. A521
is a tabulation to guide the user in determining the proper placement and phrasing of
information customarily used on a construction project. This document shows the importance
of maintaining uniformity in location and language from document to document with respect
to subject matter. Inconsistencies in either area may cause confusion, delay or
unanticipated legal problems.
A571 Guide for Interiors Supplementary Conditions
Similar to A511, AIA Document A571 is intended as an aid to practitioners in preparing
supplementary conditions on interiors projects. AIA Document A571 provides additional
information to address local variations in project requirements where A271, General
Conditions of the Contract for Furniture, Furnishings and Equipment, is used.
A701 Instructions to Bidders
This document is used when competitive bids are to be solicited for construction of the
project. Coordinated with A201 and its related documents, A701 contains instructions on
procedures to be followed by bidders in preparing and submitting their bids, including
bonding. Specific instructions or special requirements, such as the amount and type of
bonding, are to be attached to A701 as supplementary instructions to bidders.
A771 Instructions to Interiors Bidders
Similar to A701, A771 is used for projects dealing with furniture, furnishings and
equipment (FF&E). It parallels A701, but contains minor changes to maintain
consistency with A271 and its related FF&E documents.
B-Series
The documents in the B-Series relate to various forms of agreement between an owner and an
architect for professional services.
B141 Standard Form of Agreement Between Owner and Architect with
Standard Form of Architect's Service
B141 is a flexible contracting package that allows architects to offer a broad range of
services to clients spanning the life of a project, from conception to completion and
beyond. It is structured in a multi-part format consisting of an agreement form, the
Standard Form of Agreement, that contains initial information, terms and conditions and
compensation; and a service form, the Standard Form of Architect's Services; Design and
Contract Administration, that defines the architect's scope of services, one that
approximates the level of services in the prior edition of B141. The separation of the
scope of services from the rest of the owner-architect agreement allows users the freedom
to choose alternative scopes of services. The AIA intends to publish additional scopes of
services that correlate to the terms and conditions of B141.
B151 Abbreviated Standard Form of Agreement Between Owner and
Architect
AIA Document B151 is an abbreviated standard form of agreement between owner and architect
intended for use on construction projects of limited scope where the complexity and detail
of AIA Document B141, Standard Form of Agreement Between Owner and Architect, are not
required, and where services are based on five phases; Schematic Design, Design
Development, Construction Documents, Bidding and negotiation, and Construction. This
document may be used with a variety of compensation methods, including percentage of
construction cost, multiple of direct personnel expense and stipulated sum. B151 is
intended to be used in conjunction with A201, General Conditions of Contract for
Construction.
B155 Standard Form of Agreement Between Owner and Architect for a
Small Project
AIA Document B155 is a standard form of agreement between owner and architect intended for
use on a small projects; one that is modest in size and brief in duration. B155 is one of
three documents that comprise the Small Projects family of documents. It has been
developed for use with AIA Document A105, Standard Form of Agreement Between Owner and
Contractor for a Small Project, and A205, General Conditions of the Contract for
Construction of a Small Project. These documents are specifically coordinated for use as a
set. Although A105, A205 and B155 may share some similarities with other AIA documents,
the Small Projects documents should not be used without careful side-by-side comparison of
content.
In addition, B155 adopts the A205 document by reference as it pertains to the architect's
responsibilities in administration of the construction contract between owner and
contractor.
B163 Standard Form of Agreement Between Owner and Architect for
Designated Services
B163 is the most comprehensive AIA owner-architect agreement. This three-part document
contains, among other things, a thorough list of 83 possible services divided among nine
phases, covering pre-design through supplemental services. This detailed classification
allows the architect to more accurately estimate the time and personnel costs required for
a particular project. Both owner and architect benefit from the ability to clearly
establish the scope of services required for the project, as responsibilities and
compensation issues are negotiated and defined. The architect's compensation may be
calculated on a time/cost basis through use of the worksheet provided in the instruction
to B163.
Part One of the document deals with variables typical of many owner-architect agreements,
such as compensation and scope of services. The scope of services is delimited through use
of a matrix that allows the parties to designate their agreed-upon services and
responsibilities. Part Two contains detailed descriptions of the specific services found
in Part One's matrix. Part Three contains general descriptions of the parties' duties and
responsibilities. B163's list of services has been expanded beyond those of any of its
predecessor documents through inclusion of construction management and interiors services.
B171 Standard Form of Agreement Between Owner and Architect for
Interior Design Services
B171 is intended for use when the architect agrees to provide an owner with design and
administrative services for the procurement of interior furniture, furnishings and
equipment (FF&E). Unlike B141, this document includes programming of the interior
spaces and requirements as part of the service package. The authority to reject goods is
left in the hands of the owner rather than the architect, since the procurement of goods
is governed by the Uniform Commercial Code (UCC), which would make the architect's
mistaken rejection or acceptance of goods binding upon the owner. B171 is coordinated with
and adopts by reference AIA Document A271, General Conditions of the Contract for
Furniture, Furnishings, and Equipment. AIA Document A201 is also adopted by reference,
since it is contemplated that the architect may also administer contracts for construction
under B171. When B171 is used, it is anticipated that A271 will form part of the contract
between the owner and the contractor for FF&E.
B177 Abbreviated Form of Agreement for Interior Design Services
B177 is an abbreviated document that is similar to B171, but with less complexity and
detail. This document may be used where the owner and architect have a continuing
relationship from previous work together or where the project is relatively simple in
detail or short in duration.
B181 Standard Form of Agreement Between Owner and Architect for
Housing Services
This document has been developed with the assistance of the U.S. Department of Housing and
Urban Development and other federal housing agencies, and is primarily intended for use in
multi-unit housing design. B181 requires that the owner (and not the architect) furnish
cost-estimating services. B181 is coordinated with and adopts by reference AIA Document
A201, General Conditions of the Contract for Construction.
B188 Standard Form of Agreement Between Owner and Architect for
Limited Architectural Services for Housing Projects
Unlike B181, B188 is intended for use in situations where the architect will provide
limited architectural services in connection with a development housing project. It
anticipates that the owner will have extensive control over management of the project,
acting in a capacity similar to that of a developer or speculative builder of a housing
project. As a result, the owner or separate consultants retained by the owner likely will
provide the engineering services, specify the brand names of materials and equipment, and
administer payments to contractors, among other project responsibilities. B188 is not
coordinated for use with any other AIA standard form contract.
B352 Duties, Responsibilities and Limitations of Authority of the
Architect's Project Representative
When and if the owner wants additional project representation at the construction site on
a full-or part-time basis, B151and other AIA owner-architect agreements reference B352 to
establish the project representative's duties, responsibilities and limitations of
authority.
B431 Architect's Qualification Statement
The Architect's Qualification Statement is a standardized outline of information that a
client may wish to review prior to selecting an architect for a particular project. It may
be used as part of a request for proposal (RFP) or as a final check on the credentials of
an architect. Under some circumstances, B431 may also be attached to the owner-architect
agreement to show, for example, the team of professionals and consultants expected to be
employed on the owner's project.
B727 Standard Form of Agreement Between Owner and Architect for
Special Services
B727 is the most flexible of the AIA owner-architect agreements, in that the description
of services is left entirely up to the parties. Otherwise, many of the terms and
conditions are similar to those found in AIA Document B151. B727 is often used for
planning, feasibility studies, and other services. If construction administration services
are to be provided, care must be taken to coordinate B727 with the appropriate general
condition of the contract for construction.
B801/CMa Standard Form of Agreement Between Owner and Construction
Manager-Adviser where the Construction Manager Is Not a Constructor
This standard form of agreement is intended for use on projects where construction
management services are provided by a single entity who is separate and independent from
the architect and the contractor, and who acts solely as an adviser (CMa) to the owner
throughout the course of the project.
B801/CMa is coordinated for use with AIA Document B141/CMa, Standard Form of Agreement
Between Owner and Architect-Construction Manager-Adviser Edition. Both B801/CM and
B141/CMa are based on the premise that there will be a separate, and possibly multiple,
construction contractor(s) whose contracts with the owner are jointly administered by the
architect and the construction manager under AIA Document A201/CMa, General Conditions of
the Contract for Construction-Construction Manager-Adviser Edition. Caution: B801/CMa is
not coordinated with and should not be used with documents where the construction manager
acts as the constructor (i.e., contractor) for the project, such as AIA Documents A121/CMc
or A131/CMc.
B901 Standard Form of Agreement Between Design/Builder and
Architect
This document contains two agreements to be used in sequence by a design/builder and an
architect, the first covering preliminary design and the second covering final design. It
is presumed that the design/builder has previously contracted with an owner to provide
design and construction services under the agreements contained in AIA Document A191.
Although it is anticipated that a design/builder and an architect entering into the first
agreement will later enter into the second, the parties are not obligated to do so and may
conclude their relationship after the terms of the first agreement have been fulfilled.
Design/build entities may be architects, contractors or others, so long as they comply
with the governing laws, especially those pertaining to licensing and public procurement
regulations. Prior to proceeding in this fashion or entering into either agreement
contained in this document with any other entity, architects are advised to contact their
legal, insurance, and management advisers
C-Series
The documents in the C-Series relate to various forms of agreement between an architect
and other professionals, including engineers, consultants and other architects.
C141 Standard Form of Agreement Between Architect and Consultant
This is a standard form of agreement between architect and consultant, establishing their
respective responsibilities and mutual rights. C141 is most applicable to engineers, but
may also be used by consultants in other disciplines providing services to architects. Its
provisions are in accord with those of B141, B151 and AIA Document A201, General
Conditions of the Contract for Construction.
C142 Abbreviated Standard Form of Agreement Between Architect and
Consultants
This is an abbreviated form of agreement between architect and consultant, and adopts the
terms of a prime agreement between owner and architect by reference.
C727 Standard Form of Agreement Between Architect and Consultant
For Special Services
This is a standard form of agreement between architect and consultant for special
services, and is intended for use when other C-Series documents are inappropriate. It is
often used for planning, feasibility studies, post-occupancy studies and other services
that require specialized descriptions.
C801 Joint Venture Agreement for Professional Services
This document is intended to be used by two or more parties to provide for their mutual
rights and obligations. It is intended that the joint venture, once established, will
enter into a project agreement with the owner to provide professional services. The
parties may be all architects, all engineers, a combination of architects and engineers,
or another combination of professionals. The document provides a choice between two
methods of joint venture operation. The "Division of Compensation" method
assumes that services provided and the compensation received will be divided among the
parties in the proportions agreed to at the outset of the project. Each party's
profitability is then dependent on individual performance of pre-assigned tasks and is not
directly tied to that of the other parties. The "Division of Profit and Loss"
method is based on each party performing work and billing the joint venture at cost plus a
nominal amount for overhead. The ultimate profit or loss of the joint venture is divided
between the parties at completion of the project, based on their respective interests.
D-Series
The documents in the D-Series, known as the Architect-Industry documents, are applicable
across a broad range of projects.
D101 Methods of Calculating the Area and Volume of Buildings
This document establishes definitions for and describes methods of calculating the
architectural area and volume of buildings. D101 also covers interstitial space, office,
retail, and residential areas.
D200 Project Checklist
The project checklist is a convenient listing of tasks a practitioner may perform on a
given project. This checklist will assist the architect in recognizing required tasks and
in locating data necessary to fulfill assigned responsibilities. By providing space for
notes on actions taken, assignment of tasks and time frames for completion, D200 may also
serve as a permanent record of the owner's, contractor's and architect's actions and
decisions.
F-Series
F800 Architect's Accounting Form F810 through F860 are intended for use in
architecture firms' internal accounting systems. They are not coordinated for use with any
particular AIA agreement form.
F5002 The Invoice for Architectural Services form provides space for a statement
of the amount due and a summary of the status of the account.
G-Series
The documents in the G-Series relate to office administration, securing goods and
services, and administering and closing out project agreements.
G601 RFP-Land Survey
G601 allows owners to request proposals from number of surveyors based on information
deemed necessary by the owner and architect. G601 allows owner to fine-tune an RFP-through
checking appropriate boxes and filling in project specifics--to avoid cost associated with
requesting unnecessary information. The document may also form the agreement between owner
and land surveyor once and understanding is reached.
G602 RFP-Geo-Technical Services
Similar in both structure and format to AIA Document G601, G602 is a Request for Proposal
(RFP) that can evolve to form the agreement between owner and geo-technical engineer. G602
allows the owner to tailor the proposal request to address the specific needs of the
project. In consultation with the architect, the owner establishes the parameters of
service required and evaluates submissions based on criteria such as time, cost and
overall responsiveness to the terms set forth in the RFP. When an acceptable submission is
selected, the owner signs the document in triplicate, returning one copy to the engineer
and one to the architect. The agreement between owner and geo-technical engineer is thus
formed.
G604 Professional Services Supplement
This document is intended to formalize procedures for authorizing supplemental
professional actions such as expanding the scope of basic services, incurring reimbursable
expenses or proceeding with certain additional services. The document should only be used
in conjunction with an earlier agreement for professional services to provide a written
record of such authorizations, giving particulars of activities, time spans and
compensation involved.
G612 Owner's Instructions Regarding the Construction Contract, Insurance and Bonds, and
Bidding Procedures
This document is formatted as a questionnaire and is divided into three parts. Part A
relates to the contract, Part B covers insurance and bonds, and Part C deals with bidding
procedures. The sections follow a project's normal chronological sequence to provide
information when it will be needed. Because many of the items relating to the contract
will have some bearing on the development of construction documents, it is important to
place Part A in the owner's hand at the earliest possible stage of the project. The
owner's responses to Part A will lead to a selection of the appropriate delivery method
and contract forms, including the general conditions. Part B naturally follows after the
selection of the general conditions, because insurance and bonding information is
dependent upon the type of general conditions chosen. Thereafter, answers to Part C will
follow as the contract documents are further developed.
G701 Change Order
G701 may be used as written documentation of changes in the work, contract sum or contract
time that are mutually agreed to by the owner and contractor. G701 provides space for the
signatures of the owner, architect and contractor, and for a complete description of the
change.
G701/CMa Change Order-Construction Manager-Adviser Edition
The purpose of this document is essentially the same as that of G701. The major difference
is that the signature of the construction manager-adviser, along with those of the owner,
architect and contractor, is required to validate the change order.
G702/G703 Application and Certificate for Payment; Continuation Sheet
These documents provide convenient and complete forms on which the contractor can apply
for payment and the architect can certify that payment is due. The forms require the
contractor to show the status of the contract sum to date, including the total dollar
amount of the work completed and stored to date, the amount of retainage (if any), the
total of previous payments, a summary of change orders and the amount of current payment
requested. G703, Continuation Sheet, breaks the contract sum into portions of the work in
accordance with a schedule of values required by the general conditions. G702 serves as
both the contractor's application and the architect's certification. It use can expedite
payment and reduce the possibility of error. If the application is properly completed and
acceptable to the architect, the architect's signature certifies to the owner that a
payment in the amount indicated is due to the contractor. The form also allows the
architect to certify an amount different than the amount applied for, with explanation
provided by the architect.
G702/CMa Application and Certificate for Payment-Construction Manager-
Adviser Edition
Though the use and purpose of G702/CMa remains substantially similar to that of G702, the
construction manager-adviser edition expands responsibility for certification of payment
to include both architect and construction manager. Similarly, both architect and
construction manager may certify a different amount than that applied for, with each
initialing the figures that have been changed and providing written explanation(s)
accordingly. The standard G703 Continuation Sheet is appropriate for use with G702/CMa.
G704 Certificate of Substantial Completion
G704 is a standard form for recording the date of substantial completion of the work or a
designated portion thereof. The contractor prepares a list of items to be completed or
corrected, and the architect verifies and amends this list. If the architect finds that
the work is substantially complete, the form is prepared for acceptance by the contractor
and the owner. Appended thereto is the list of items to be completed or corrected. The
form provides for agreement as to the time allowed for completion or correction of the
items, the date when the owner will occupy the work or designated portion thereof, and a
description of responsibilities for maintenance, heat, utilities, and insurance.
G706 Contractor's Affidavit of Payment of Debts and Claims
The contractor submits this affidavit with the final request for payment, stating that all
payrolls, bills for materials and equipment, and other indebtedness connected with the
work for which the owner might be responsible have been paid or otherwise satisfied. G706
requires the contractor to list any indebtedness or known claims in connection with the
construction contract that have not been paid or otherwise satisfied. The contractor may
also be required to furnish a lien bond or indemnity bond to protect the owner with
respect to each exception.
G706A Contractor's Affidavit of Release of Liens
G706A supports AIA Document G706 in the event that the owner requires a sworn statement of
the contractor stating that all releases or waivers of liens have been received. In such
event, it is normal for the contractor to submit G706 and G706A, along with attached
releases or waivers of liens for the contractor, all subcontractors and others who may
have lien right against the owner's property. The contractor is required to list any
exceptions to the sworn statement provided in G706A, and may be required to furnish to the
owner a lien bond or indemnity bond to protect the owner with respect to such exceptions.
G707 Consent of Surety to Final Payment
By obtaining the surety's approval of final payment to the contractor and its agreement
that final payment will not relieve the surety of any of its obligations, the owner may
preserve it rights under the bonds.
G707A Consent of Surety to Reduction in or Partial Release of Retainage
This is a standard form for use when a surety company is involved and the owner-contractor
agreement contains a clause whereby retainage is reduced during the course of the
construction project. When duly executed, G707A assures the owner that such reduction or
partial release of retainage does not relieve the surety of its obligations.
G709 Proposal Request
This form is used to obtain price quotations required in the negotiation of change orders.
G709 is not a change order or a direction to proceed with the work; it is simply a request
to the contractor for information related to a proposed change in the construction
contract.
G710 Architect's Supplemental Instructions
Architect's supplemental instructions are used by the architect to issue additional
instructions or interpretations or to order minor changes in the work. The form is
intended to assist the architect in performing obligations as interpreter of the contract
document requirements in accordance with the owner-architect agreement and the general
conditions. This form should not be used to change the contract sum or contract time. If a
change in the contract sum or contract time is involved, a Change Order or Construction
Change Directive should be used.
G711 Architect's Field Report
The Architect's Field Report is a standard form for the architect's project representative
to use in maintaining a concise record of site visits or, in the case of a full-time
project representative, a daily log of construction activities.
G712 Shop Drawing and Sample Record
This is a standard form by which the architect can schedule and monitor shop drawings and
samples. Since this process tends to be complex, the schedule provided in G712 shows the
progress of a submittal, which in turn contributes to the orderly processing of work. G712
can also serve as a permanent record of the chronology of the submittal process.
G714 Construction Change Directive
This document was developed as a directive for changes in the work, which, if not
expeditiously implemented, might delay the project. In contrast to a Change Order (AIA
Document G701), G714 is to be used where the owner and contractor, for whatever reason,
have not reached agreement on proposed changes in the contract sum or contract time. Upon
receipt of a completed G714, the contractor must promptly proceed with the change in the
work described therein.
G714/CMa Construction Change Directive, Construction Manager-Adviser
Edition
G714/CMa is designed to effect the same type of substantive changes in the work described
in the synopsis of G714, above. Where as the owner and architect must both sign the G714
in order for the directive to become a valid contractual instrument, G714/CMa requires
execution by owner, architect, and construction manager-adviser.
G715 Instruction Sheet and Attachment for ACORD Certificate of
Insurance
This document is intended for use in adopting ACORD Form 25-S to certify the coverage
required of contractors under AIA Document A201. The document consists of instructions for
filling out the ACORD form and an attachment for information not called for on the ACORD
form.
G722/ Project Application and Project Certificate for Payment; Project
CMa Application Summary and G723 CMa
These documents are similar in purpose to the combination of G702 and G703, but are for
use construction management projects where the CM serves as an adviser to the owner. Each
contractor submits separate G702/CMa and G703 documents to the construction
manger-adviser, who collects and compiles them to complete G723/CMa. G723/CMa then serves
as a summary of the contractors' applications, with project totals being transferred to
G722/CMa. The construction manager-adviser can then sign the form, have it notarized and
submit it along with the G723/CMa (which has all of the separate contractor's G702/CMa
forms attached) to the architect for review and appropriate action.
Promises, Promises: Forging Healthy Project Relationships
The American Institute of Architects, through its Documents Education Task Group, has
developed Promises, Promises: Forging Healthy Project Relationships, a series of
continuing education seminars that go to the heart of these relationships and analyze the
subject matter by the principles involved and their relationship to "real world"
problems through interesting, varied scenarios-great for audience involvement. This is not
a "let's read the documents together" program. Together, the manuals form a
cohesive educational experience as they focus on AIA standard contracts, which can help
guide these relationships, leading to more efficient, satisfying and profitable
construction projects.
Advanced Contract Concepts
This manual covers the essentials of contract law: the elements of contract, fundamental
principles of agency and negligence law, and the use of standard contract documents. It
also includes an overview of the recent, major changes to two of AIA's standard contract
documents: the A201 General Conditions of the Contract for Construction and B141-1997,
Standard Form of Agreement Between Owner and Architect.
Design Services
This manual addresses the general responsibilities of the architect and the owner
B141-1997, Standard Form of Agreement between Owner and Architect. Specifically, these
include establishing a program and budget, setting basic project parameters and agreeing
on the architect's scope of services. The manual also includes an overview of the Standard
Form of Architect's Services: Design and Contract Administration, the first scope of
services published with B141-1997.
Design and Contract Administration: Contract Conditions
Contract conditions form the framework within which the owner and architect carry out
their responsibilities to one another. This manual addresses the contract conditions that
generally apply over the whole coarse of the owner-architect relationship, including
compensation and billing, project timing and duration, responsibilities of the owner, and
ownership and use of documents.
Contract Administration Services
This manual covers roles and responsibilities of owner, architect and contractor as the
project moves into construction.
Contract Administration: Office
This manual addresses contract administration from the architect's perspective when
"back in the office" and not in the field visiting the owner's site. It covers
project initiation, submittals, changes, timing issues, suspension and termination, and
special provisions, such as property insurance.
Construction Contract Administration: Field
This manual addresses construction contract administration conditions relevant to the
architect's services on the job site, administering the contract and evaluating the work
as it progresses. The manual covers subcontractor relations, contractor's payments,
claims, corrections to the work and project close-out.